
In September 2016, the second-largest city in Alberta, Canada, celebrated the completion of progressive stormwater management at 105th Street (renamed to Columbia Ave) Edmonton, as part of the Green Street project with the city.
We interviewed the project partners SevenM Construction and ISL Engineering six years after completion to find out about the long-term results and sustainability of the project.
Edmonton’s city limits hold seven sectors, with the mature downtown sector at its core. Surrounding it are six suburban neighbourhoods. Most buildings and infrastructure were built before the 1970s, and the new generation is taking steps to revitalize their city infrastructure and take an active role in stormwater management.
Project Challenges
The open matrix design boasts unique advantages that present solutions to challenges and considerations like project cost, transport, installation, and the need for green infrastructure and stormwater quality objectives. The cell’s components can nest inside one another and are constructed of lightweight polymers, allowing for significantly lower costs in freight.
Once the product is at the installation site, its simple construction doesn’t require unique tools or specialized labour, thus also allowing for a smaller task force.
The Stratavault’s open design allows for the unhindered installation of all necessary subterranean construction, such as water pipes. Even so, with its “quick and simple to assemble” matrix design, the cell system continues to provide the surrounding sidewalks “with sufficient structural integrity to withstand traffic loads,” Cody Mitchel, Project Manager at SevenM Construction, noted.